ҵ

Upgrade Kit 12-15/16 Long Leads AAMI

Diagnostic ECG Patient Cables and Leads

Find similar products

Long Upgrade Kit shielded 12-15/16 leads AAMI color coded for PageWriter TC 70. Consisting of 4 additional long lead assy (48" (1.22m0)), 6 shorting plugs, lead separators, 6 colored clips, 6 colored rings, 4 brown base rings and instructions for use. The additional lead sets come pre-assembled with the brown base rings. 1 kit = 1 sales unit.

Specifications

ECG Diagnostic ECG Patient Cables and Leads
ECG Diagnostic ECG Patient Cables and Leads
Patient Application
  • Child; Adult
Application Site
  • Limb; Chest
Number of Leads
  • 16
Shielded
  • Shielded
Electrode Attachment Method
  • Alligator Clip
Color Coding
  • AAMI
Product details
Product details
Use with Non-Philips Healthcare Equipment
  • No
Use with Philips Healthcare Equipment
  • 860315, 860310
Product Category
  • ECG
Product Type
  • Diagnostic ECG Patient Cables and Leads
CE Certified
  • No
Single-Patient Use OR Multi-Patient Use
  • Multi-Patient Use
Packaging Unit
  • 1
Not manufactured with natural rubber latex
  • Yes
Minimum Shelf Life
  • None
Sterile OR Non-Sterile
  • Non-Sterile
Use with Other Supplies
  • N/A
ECG Diagnostic ECG Patient Cables and Leads
ECG Diagnostic ECG Patient Cables and Leads
Patient Application
  • Child; Adult
Application Site
  • Limb; Chest
Product details
Product details
Use with Non-Philips Healthcare Equipment
  • No
Use with Philips Healthcare Equipment
  • 860315, 860310
See all specifications
ECG Diagnostic ECG Patient Cables and Leads
ECG Diagnostic ECG Patient Cables and Leads
Patient Application
  • Child; Adult
Application Site
  • Limb; Chest
Number of Leads
  • 16
Shielded
  • Shielded
Electrode Attachment Method
  • Alligator Clip
Color Coding
  • AAMI
Product details
Product details
Use with Non-Philips Healthcare Equipment
  • No
Use with Philips Healthcare Equipment
  • 860315, 860310
Product Category
  • ECG
Product Type
  • Diagnostic ECG Patient Cables and Leads
CE Certified
  • No
Single-Patient Use OR Multi-Patient Use
  • Multi-Patient Use
Packaging Unit
  • 1
Not manufactured with natural rubber latex
  • Yes
Minimum Shelf Life
  • None
Sterile OR Non-Sterile
  • Non-Sterile
Use with Other Supplies
  • N/A
  • Product may not be available in all geographies, please check with your Philips representative for complete portfolio availability.

You are about to visit a Philips global content page

Continue

You are about to visit a Philips global content page

Continue

Our site can best be viewed with the latest version of Microsoft Edge, Google Chrome or Firefox.

You are entering a Philips Healthcare Australia website
Please select the checkbox

The information on this site is not intended for consumers. The information is directed exclusively to health professionals, health practitioners, persons who are purchasing officers in hospitals, and persons who are engaged in the business of wholesaling therapeutic goods (as per s42AA of the Therapeutic Goods Act 1989 (Cth), and s6 of the Therapeutic Goods (Therapeutic Goods Advertising Code) Instrument 2021).

By clicking “Continue” you are indicating that you are one of the intended audiences. Click cancel to be redirected to the Philips website.